Excelling in municipal water and wastewater solutions // Learn about the work we do >>
Triview Metropolitan District

Triview Metropolitan District

Sanctuary Pointe Tank and Booster Pump Station (2017)

Continued growth along the Front Range has required many systems to increase the capacity, storage, and install new pumping systems. The Triview Metropolitan District tasked JDS-Hydro with the design of a new 1.1 MG water storage tank and booster pump station to serve expansion within the District.

The work included master planning, hydraulic analysis, permitting, design and construction management of a 1.1 MG AWWA D110 Pre-Stressed Concrete Tank and 0.75 MGD Booster Pump Station. The Booster Station design included superstructure, piping, control narrative, and pumping system for the upper pressure zone. Other work items included the design and construction management for the 12” water transmission main that provides water to the new tank.

The tank, located specifically for maximum hydraulic capability, provided a challenge during construction due to the limited site space. JDS-Hydro was able to coordinate two contractors during the construction phase. The tank and booster pump station went online April 2017.

Budget: $2.6 Million  

 

Comments are closed.